The data center guide

A plain-language guide to how data centers get built, what every role does, what the work pays, and where it's happening. Written by Czarina Tabayoyong, a data center and AI infrastructure recruiter, from searches and public sources.

By Czarina Tabayoyong, Founder, Critical Path Hiring. Former Amazon, AWS and Google recruiter.

Last reviewed

Reviewed as terms, pay and markets change.

01 Start here

Start with the data center glossary

Data center work comes with its own vocabulary. The data center glossary defines 56 terms in plain English, with what each one means on the job. These eight come up first.

02 The build

How a data center gets built

How a data center gets builtStage 1, site + power: hires developers, power and utility leads. Stage 2, design + precon: hires mep designers, precon managers. Stage 3, construction: hires superintendents, pms, electricians, mechanical trades. Stage 4, commissioning l1 to l5: hires cxas, cx engineers, tab, controls. Stage 5, turnover: hires operations leadership, critical facilities engineers. Stage 6, operations: hires technicians, shift engineers.01SITE + POWERDEVELOPERS, POWER AND UTILITYLEADS02DESIGN + PRECONMEP DESIGNERS, PRECON MANAGERS03CONSTRUCTIONSUPERINTENDENTS, PMS,ELECTRICIANS, MECHANICAL TRADES04COMMISSIONING L1 TO L5CXAS, CX ENGINEERS, TAB,CONTROLS05TURNOVEROPERATIONS LEADERSHIP, CRITICALFACILITIES ENGINEERS06OPERATIONSTECHNICIANS, SHIFT ENGINEERS
A data center moves from site and power through design, construction and commissioning to turnover and live operations. Each stage hires a different group of people, and commissioning and operations hiring has to start before the stage arrives.
  1. 01

    Site and power

    Land, utility interconnection and permits.

    Site launch and team builds
  2. 02

    Design and preconstruction

    MEP design and long-lead equipment orders.

    Data center construction jobs
  3. 03

    Construction

    The shell goes up first, then electrical and mechanical installation.

    Data center construction jobs
  4. 04

    Commissioning, Levels 1 to 5

    Testing every system, ending with all of them under load.

    The commissioning hub
  5. 05

    Turnover

    Handing the finished site to the operations team.

    Turnover, defined
  6. 06

    Operations

    Running the live site around the clock.

    Critical facilities engineer

06 Employers

For hiring teams

Staffing a build or a live site? Read how to hire data center talent, or book a hiring diagnostic.

07 Newsletter

Get new guides and market updates

No sequences. One issue when there is something worth saying.

08 Questions

Data center questions, answered

What is a data center?
A building that houses the servers, storage and networking equipment that run websites, cloud services and AI, plus the power and cooling systems that keep them running around the clock.
How long does it take to build a data center?
Plan on roughly 18 to 36 months from land to live. Power availability is usually the biggest variable, and large campuses come online in phases over several years.
What jobs are there in data centers?
Five main tracks: construction, commissioning, critical facilities and operations, MEP, and AI infrastructure. See the jobs section of this guide for where each track starts.
Do you need a degree to work in a data center?
Many technician and trades roles don't require one. Military, electrical, HVAC and IT backgrounds are common entry routes. Engineering and commissioning lead roles more often expect a degree or equivalent experience. See the careers in data centers guide for entry paths.
What's the difference between a hyperscale and a colocation data center?
A hyperscale site is built by one company for its own cloud or AI workloads. A colocation site rents space, power and cooling to many tenants.