Critical Path Hiring logoCritical PathHiring
Book a hiring diagnostic

Expertise · Data center recruiting

Power and Project Controls Recruiting

We recruit power and program roles for data center builds: substation, interconnect and utility engineers, electrical design leads, energy managers, and project controls staff for scheduling, cost control, estimating and PMO reporting. These roles are often filled last.

Audience

We work with developers and operators, EPCs and general contractors, engineering firms, utilities-facing teams and infrastructure programs with multi-site portfolios.

Common hiring problems

  • Nobody inside the company owns the interconnect schedule, so delays go unnoticed.
  • Cost and schedule reports come out too late to change a decision.
  • Estimating and scheduling roles stay open while construction speeds up.
  • Energy strategy and capacity planning sit with people who have no time for it.

Role families

Roles and screening

Power and utilities engineering

Substation engineer, interconnect lead, electrical design lead, power systems engineer

Utility coordination, study work, equipment lead-time reality and the schedule they owned.

Energy and capacity

Energy manager, capacity planning lead

Load forecasting, utility rate and tariff literacy, and the tradeoffs behind on-site generation.

Project controls

Project controls manager, scheduler, cost controller, estimator

Schedule integrity, earned value practice, change management and reporting that leadership can act on.

PMO and program delivery

Program manager, PMO lead, project manager, document control

Multi-stakeholder delivery, governance cadence and portfolio reporting across sites.

Environments

Technologies and environments

  • Utility interconnect and substation delivery
  • Primavera P6 and CPM scheduling practice
  • Earned value, change orders and cost reporting
  • Long-lead equipment procurement and expediting
  • Multi-site program governance and PMO reporting

Role scope

Requirement mistakes

Sort these out before outreach starts.

  • Hiring project controls after the schedule is already unreliable.
  • Treating a scheduler and a cost controller as one role on a large program.
  • Screening power engineers on software tools without asking about utility coordination.
  • Leaving interconnect ownership with a consultant and no internal counterpart.

Process

Search process

Czarina Tabayoyong agrees on the scorecard with your interview panel, builds a list of named candidates and contacts them directly. You get a written report every week. At the end, your team keeps all the research and the candidate pipeline. We use AI tools for research, and Czarina makes the recommendations herself.

FAQ

Recruiting questions

Why hire project controls early?
A reliable schedule and cost baseline lets you change decisions while there is still time. Someone hired after the schedule slips spends their first months rebuilding a baseline people trust.
Do you recruit utility-side power engineers?
Yes, including candidates from utilities, transmission and distribution engineering firms and industrial power markets who transfer into data center interconnect work.
Can you cover PMO and document control roles?
Yes. We include program delivery and document control roles in the same hiring plan.
How do you assess schedulers?
On the schedule they owned: logic quality, float discipline, how change was absorbed, and whether the schedule was used for decisions or produced for a report.

Next step

Bring the scorecard and the deadline. We'll tell you what the candidate market looks like and which engagement we'd recommend, including when your team can fill the role internally.