Northern Virginia data center pipeline after the Digital Gateway

All 4 Northern Virginia projects on our tracker that are approved or under construction are outside Loudoun and Fairfax. The largest blocked project in our nine markets, the Prince William Digital Gateway, counts as zero in our megawatt totals because its applicants never stated power. We estimate it at 4.0 to 6.3 GW.

Czarina Tabayoyong, founder of Critical Path Hiring

By Czarina Tabayoyong, Founder, Critical Path Hiring. Former Amazon, AWS and Google recruiter.

Last reviewed · First published · Next update

Updated with the monthly tracker refresh.

Refresh alerts

One email each time this page is refreshed, with what changed.

Privacy policy

Findings

  • 4 of 10 tracked Northern Virginia projects are approved or under construction, in Stafford, Culpeper and Prince William counties. All 4 tracked projects in Loudoun and Fairfax are proposals.
  • Amazon is named on 3 of the 10: Culpeper Technology Zone, Devlin Technology Park and Amazon Warrenton. Amazon also posts 358 of the 463 Virginia data center openings in our hyperscaler jobs index.
  • 22 of the 31 stalled or cancelled projects in our nine markets state no capacity. The 9 that do add up to 3,325 MW, the figure in our pushback labor study.
  • 8 blocked projects state floor area only, 35.8 million square feet. At the capacity-to-area ratios of tracked projects that state both, that is about 6.3 to 9.8 GW, roughly 1.9 to 3.0 times the stated count. These are estimates.
  • The Digital Gateway is 64% of that floor area. Our 4.0 to 6.3 GW estimate for it is higher than the Piedmont Environmental Council's "at a minimum" figure of 2 to 3 GW, the only other published estimate we found.

County split

  • Approved or under construction
  • Proposed, stalled or cancelled
Northern Virginia tracked projects by county and stageCulpeper: 2 approved or under construction, 0 proposed, stalled or cancelled; Prince William: 1 approved or under construction, 1 proposed, stalled or cancelled; Stafford: 1 approved or under construction, 0 proposed, stalled or cancelled; Loudoun: 0 approved or under construction, 2 proposed, stalled or cancelled; Fairfax: 0 approved or under construction, 2 proposed, stalled or cancelled; Fauquier: 0 approved or under construction, 1 proposed, stalled or cancelled012Culpeper: EdgeCore Culpeper, Culpeper Technology ZoneCulpeper2Prince William: Devlin Technology Park, Prince William Digital GatewayPrince William2Stafford: Stafford Technology CampusStafford1Loudoun: Equinix DC-23, Beaumeade campus, Leesburg GatewayLoudoun2Fairfax: Plaza 500, Chantilly (3721 Stonecroft Blvd.)Fairfax2Fauquier: Amazon WarrentonFauquier1
10 tracked projects. Counts are small, so this shows where projects sit, not a ranking of counties.
ProjectCountyStageDeveloperSize as stated
Stafford Technology CampusStaffordUnder constructionStack Infrastructure; Peterson Cos. won the rezoningOver 1 GW across 19 data centers on about 500 acres
EdgeCore CulpeperCulpeperApprovedEdgeCore120 acres, 216 MW to start with room for 432 MW, 1.4 million sq ft
Culpeper Technology ZoneCulpeperApprovedAmazon and others1,000-acre zone; county expects 7 new campuses
Devlin Technology ParkPrince William (Bristow)ApprovedAmazon Data Services, which bought about 70% of the site from Stanley Martin270 acres, up to 3.5 million sq ft and 3 substations
Equinix DC-23, Beaumeade campusLoudoun (Ashburn)ProposedEquinixNot stated
Plaza 500Fairfax (near Alexandria)ProposedStarwood Capital GroupAbout 34 acres; planned substation about 176 MW
Chantilly (3721 Stonecroft Blvd.)Fairfax (Chantilly)ProposedStarwood Capital GroupNearly 42 acres
Leesburg GatewayLoudoun (Leesburg)ProposedThe Peterson Companies3 data center buildings on 107 acres
Amazon WarrentonFauquier (Warrenton)StalledAmazon42 acres
Prince William Digital GatewayPrince WilliamCancelledQTS and CompassAbout 2,100 acres, 23 million sq ft

Blocked capacity

  • Stated, or low estimate
  • High estimate
Blocked data center capacity in nine markets, stated and estimatedStated by 9 projects: 3,325 MW. Estimated for 8 projects stating only square footage: 6,250 to 9,840 MW. Digital Gateway alone: 4,020 to 6,330 MW.0 MW5,000 MW10,000 MWStated MW: 3,325 MWStated MW9 projects3,325 MWFloor area only: 6,250 to 9,840 MWFloor area only8 projects, estimate6,250 to 9,840 MWDigital Gateway: 4,020 to 6,330 MWDigital Gateway1 project, estimate4,020 to 6,330 MW
14 more blocked projects state neither capacity nor floor area and are not in any bar.
Blocked project, floor area onlyMarketMillion sq ftEstimated MW
Prince William Digital GatewayNorthern Virginia23.04,020 to 6,330
Tract Yuma and Perryville Roads rezoning requestPhoenix5.6980 to 1,540
Liberty Road data center campusAtlanta4.4770 to 1,210
Project MidwayPhoenix1.3220 to 340
Oakline at Mill Creek (Salem)Hillsboro0.60100 to 170
Chandler AI data center and business complexPhoenix0.4270 to 120
Highway 85 North data centerAtlanta0.3050 to 80
Project Kilo (Kenyon Road and Route 25)Chicago0.2030 to 60

Hiring impact

On our tracker, the next Northern Virginia sites to need commissioning and operations teams are the Stafford Technology Campus, EdgeCore and the Amazon campus in Culpeper, and Devlin Technology Park in Bristow. Loudoun County, home to the Ashburn cluster, has two tracked projects, both proposals. For candidates who live near Ashburn, the next site is a longer commute or a relocation, so commute and per diem belong in the first conversation.

Amazon is named on three of the ten projects and posts 358 of the 463 hyperscaler data center openings in Virginia. Commissioning firms and contractors on those sites hire from the same technician pool Amazon's own postings draw on. For the quarter-by-quarter timing of commissioning windows, see the commissioning collision study.

The Digital Gateway was planned as a 10-year build. It was the largest project by floor area on any of our nine trackers, and it never appeared in our megawatt totals.

Method and limits

  • Northern Virginia: the 10 projects in our Northern Virginia tracker as of 2026-10-26. Counties are taken from each project's source.
  • Capacity estimate: 24 tracked projects state both MW and floor area. Their ratio runs from 77 to 511 MW per million square feet, median 232. We use the middle half, 175 to 275, for the low and high estimates. Where only a first phase states both, the first-phase figures are used.
  • Digital Gateway figures: acreage, floor area and building count from the rezoning as reported; the county's finance estimate of $24.7 billion in investment is reported by Data Center Frontier. Dominion told the Prince William Times in 2022 that it was too early to know the size of the power need. Cancellation: Virginia Business.
  • Floor area is a rough proxy for power. A campus planned for AI training load can carry far more MW per square foot than an older enterprise building, so treat each estimate as a scale.
  • A blocked project's MW would have been built in phases over years, so the totals here are capacity, not workers needed at one time.

Questions

How big was the Prince William Digital Gateway?
The rezoning covered about 2,139 acres and 23.0 million square feet in about 37 buildings. The applicants never stated a power figure. Using the median ratio of capacity to floor area on 24 tracked projects that state both, we estimate about 4.0 to 6.3 GW. The project was cancelled in July 2026.
Where are new Northern Virginia data centers being built?
Of the 10 Northern Virginia projects on our tracker, 4 are approved or under construction, and all 4 are in Stafford, Culpeper and Prince William counties. The 4 tracked projects in Loudoun and Fairfax are all still proposals.
How much data center capacity has been blocked or cancelled?
Across our nine markets, 31 projects are stalled or cancelled. 9 state capacity, 3,325 MW in total. Another 8 state only floor area, 35.8 million square feet, which we estimate at 6.3 to 9.8 GW. 14 state neither.

Hiring call

Book a hiring call and we'll talk through which roles your build needs and when to bring them on.

Czarina Tabayoyong, founder of Critical Path Hiring

Czarina Tabayoyong

Founder and principal recruiter, Critical Path Hiring. Czarina recruits commissioning, MEP, power and critical facilities people for data center builds. She previously recruited cloud and data center architecture talent at AWS Professional Services, and PMO and project delivery talent for hyperscale data center campuses in Texas and Virginia.

More about Czarina · LinkedIn